Steam – Turbine Generator & ACC LTSA
Steam Turbine – Generator and ACC Long Term Service Agreements ensuring greater than 98% availability.
Read More >Combined Heat and Power (CHP) – LTSA
Combined Heat and Power – Long Term Service Agreements ensuring greater reliability and availability.
Read More >Steam Turbine Package Supply
Steam Turbine Package Supply – Engineering, Project Management, Procurement, Installation and Commissioning.
Read More >Performance Assessment - Heat Balance
Improve boiler operational stability and performance by utilising first-principle fluid and thermodynamics.
Read More >Reciprocating Compressor - Delivering Quality
Resident surveyor for client’s compressor installations.
Read More >New Steam Turbine Inspection
Inspection of new Steam Turbine set ensuring product meets contract requirements.
Read More >Vibration Assessment and Management System (VAMS)
Implementation of REV’s Vibration Assessment and Management System.
Read More >ACC Motor Upgrade Specification
Design change of ACC fan motor to enhance vacuum conditions.
Read More >CHP Availability Optimisation
Increased power generation and thermal output from revised operating philosophy and maintenance regime.
Read More >Steam System Optimisation
Increased stability and power generation through manipulation of Siemens PCS7 Control.
Read More >Vacuum Pump Failure Investigation
Failure Investigation of Liquid Ring Vacuum pump with operational philosophy modifications.
Read More >Boiler Inspection, Repair and Testing
Inspection, repair and testing of two 18 tonne / hour steam generating boilers.
Read More >Steam System Isolation Upgrade
Upgrade to ensure safety during turbine and boiler maintenance activities.
Read More >Power Exportation Optimisation
Increased power generation from control system logic modification.
Read More >Steam Turbine Failure Investigation
Identify the root cause of catastrophic steam turbine failure and detail action required to prevent re-occurrence.
Read More >