01778 380 646

 

Optimisation Projects

Home | Engineering Consultancy | Optimisation
Project

Steam – Turbine Generator & ACC LTSA

Steam Turbine – Generator and ACC Long Term Service Agreements ensuring greater than 98% availability.

Read More >
Project

Combined Heat and Power (CHP) – LTSA

Combined Heat and Power – Long Term Service Agreements ensuring greater reliability and availability.

Read More >
Project

Steam Turbine Package Supply

Steam Turbine Package Supply – Engineering, Project Management, Procurement, Installation and Commissioning.

Read More >
Project

Performance Assessment - Heat Balance

Improve boiler operational stability and performance by utilising first-principle fluid and thermodynamics.

Read More >
Project

ACC Motor Upgrade Specification

Design change of ACC fan motor to enhance vacuum conditions.

Read More >
Project

CHP Availability Optimisation

Increased power generation and thermal output from revised operating philosophy and maintenance regime.

Read More >
Project

Steam System Optimisation

Increased stability and power generation through manipulation of Siemens PCS7 Control.

Read More >
Project

Steam System Isolation Upgrade

Upgrade to ensure safety during turbine and boiler maintenance activities.

Read More >
Project

Power Exportation Optimisation

Increased power generation from control system logic modification.

Read More >
 

Rotating Equipment Verification

REV is an engineering consultancy specialising in Rotating Equipment and Energy from Waste (EfW) Technologies

Get in Touch >
 
This site uses cookies.
Configure
 
Read our privacy policy

This site uses cookies for marketing, personalisation, and analysis purposes. You can opt out of this at any time or view our full privacy policy for more information.